"Two firms before them quoted to patch the valley and see. Ridgeline photographed the rotted deck, quoted properly, done in four days."Sarah M · re-roof & chimney

Roofing contractors · Anytown · since 2004
Roofs done once.
Done right.Roofing website example · built by IINES
A family roofing firm for people who are tired of patch-job cowboys. A free survey, a fixed written price, our own directly employed roofers — and a 25-year workmanship guarantee on every full re-roof.
22yrs
Family-run since 2004
4,100+
Roofs repaired or renewed
8
Roofers, directly employed
25yrs
Workmanship guarantee
Services
Everything above your head
One firm for the lot — from a £180 repair to a full slate re-roof, by roofers who have worked on your type of house before. Hover a row for the fast route to a booking.
Book a free survey →Roof repairs
from £180Slipped slates, cracked tiles, leaking valleys, failed flashing — surveyed properly, photographed, fixed first time.
Book a repair 02Full re-roofs
from £4,800Strip, inspect, membrane, battens, new tiles or slates — three to five days on a semi, 25-year guarantee at handover.
Price a re-roof 03Flat roofs
from £2,400EPDM rubber and GRP fibreglass with 20-year material warranties. No more felt that splits every second winter.
Price a flat roof 04Gutters, fascia & soffits
from £18 / mFull roofline replacement in a day, or proper cast-aluminium gutter maintenance. Cleared, flowed, photographed.
Price roofline 05Chimney work
from £350Repointing, lead flashing, flaunching and pots re-bedded — the jobs that stop the damp patch on the ceiling.
Book chimney work 06Roof windows & Velux
from £650Supply and fit, misted-unit replacement, flat-to-pitched glass conversions. Internal finishes quoted at the same time.
Price a roof window
The quote never moved and the garden was cleaner when they left than when they arrived.Dan K · full re-roof, tiled semi
Our work
Our roofers.
Not subcontractors.
Eight directly employed roofers, two scaffolding crews and one rule that has never changed: no shortcuts above anyone’s head.
Every job is photographed at strip-off and handover, so the quote you approve is the invoice you pay. Old materials go in the skip, not your garden, and the site is swept before we knock on your door.
Slate, tile, EPDM, lead — the trades other firms farm out, we keep in-house, including our own lead-qualified and harness-trained roofers.
Book a free survey →Prices
The price we say is the price you pay
Every job agreed in writing before a slate is touched. Find rotted decking under the old tiles, and you get a photo, a fixed price for the extra, and the choice to say no.
*Survey fee waived when we carry out the work. Re-roofs staged: nothing for stage two until stage one is signed off. Scaffold included in every re-roof quote. Prices move once a year, in January, in writing.
Every re-roof
Your re-roof, in eight steps
The same eight-step plan on every full re-roof, in the quote, in writing. Watch it light up — it runs exactly like this on site, because that is how our roofers are trained to work.
Survey & fixed quote
On the roof, everything photographed, fixed price in writing the same day.
Scaffold & skip
Our own crews, sited with you, protection laid before a tile moves.
Strip & inspect
Old tiles off, decking inspected and photographed — extras priced before they happen.
Membrane & battens
Breathable membrane and treated battens fixed to NFRC standards.
Undercloak & verges
Edges, verges and fascia checks done while the deck is open.
Tiles or slates fixed
Fixings, spacing and alignment to the manufacturer spec, not to guesswork.
Ridges, hips & lead
Ridge and hip tiles beded or dry-fixed, leadwork dressed in by our own lead roofer.
Clean-up & sign-off
Site swept, skip gone, scaffold down, guarantee certificate with the invoice.
Reviews
Photos of the stripped deck before they fitted a single tile, the quote never moved, and the garden was cleaner when they left than when they arrived. Rare these days.Dan K · full re-roof, tiled semi · 4.9/5 across 400+ reviews
"Storm took six slates on a Sunday. Tarp up that evening, permanent repair Tuesday, and they handled the insurance photo file for us."Priya R · storm damage repair
Questions
Straight answers
Anything else, ring the office on 01632 960 340 — you will get a roofer, not a script.
How long does a full re-roof take?
Three to four days for a tiled semi, five to seven for slate, weather permitting. We strip and re-cover one elevation at a time and the roof is watertight at every stage — we never leave it half-finished overnight.
What happens if it rains mid-job?
Membrane goes down the same day as stripping, so the roof stays watertight at every stage. If heavy rain is forecast for days we hold at a watertight point: the schedule moves, the price does not.
Do you use subcontractors?
Never. Every roofer on your roof is directly employed by Ridgeline, harness-trained, and covered by our £10m public liability policy. The scaffold crews are ours too, which is why the scaffold goes up and comes down when we say it will.
How do payments work?
Repairs: nothing until the work is done. Re-roofs: staged payments tied to the eight steps — nothing for stage two until stage one is signed off. No deposits, no cash-only asks, card or bank transfer.
What does the 25-year guarantee cover?
Workmanship: if a tile we fixed slips, a valley we dressed leaks or a ridge we beded fails inside 25 years, we come back and make it right at no cost. Material warranties run separately with the manufacturers, up to 20 years on EPDM and GRP, and we register them for you.
Can you help with an insurance claim?
Yes. For storm damage we provide the photographs, written report and invoice in the format insurers want, and we liaise with loss adjusters directly. The emergency tarp-up call-out is £95, credited back if we do the permanent repair.
My house is listed or in a conservation area.
We can work on it, and we will tell you honestly what that involves: matching slates and reclaimed materials sourced in advance, and the photographs and specifications your conservation officer will want, before a single slate moves.
How do I spot a cowboy quote?
Three tells: no written fixed price, no scaffolding in the quote, and a deposit demanded up front. If a quote is vague about what happens to the decking underneath, that is where the cheap quote gets expensive. Ours states it, photographs it and prices it before it happens.
Do you do small jobs?
Yes — a single slipped slate is a real job to us: from £95 plus the £65 survey fee, waived if we do the work. Small jobs get the same guarantee and the same photos; they just take an hour instead of a week.
Booking
Free survey, within 48 hours.
Tell us about the roof and we will come and look. A fixed written price the same day — no pressure, and no follow-up calls if you say no.
- A text within minutes confirming your request
- A roofer calls to arrange the survey, ladders and all
- Fixed written quote with photos, by email, the same day
- Start date, a named lead roofer, and the eight-step plan
Request a survey
Concept form · nothing is sent or stored